Aside from construction of new buildings, the company has been active in A&A works / upgrading works throughout the years. Armed with a team of experienced professionals dedicated to this work category, the company has completed various A&A projects with clients such as Ministry of Education (MOE) and Housing and Development Board (HDB). The company currently possesses a L6 grading under the Interior Decoration and Finishing works workhead.

MOE

Chongzheng Primary School / Yumin Primary School

 

Proposed Additions and Alterations to Chongzheng Primary School and Yumin Primary School

Project Size: $17,77 million

Greenwood Primary School / Qihua Primary School / Xinmin Primary School / Xinmin Secondary School

 

Proposed Additions And Alterations To Greenwood Primary School, Qihua Primary School, Xinmin Primary School & Xinmin Secondary School

Project Size: $33.63 million

Evergreen Primary School

 

Proposed Additions & Alterations To Existing Evergreen Primary School At 31 Woodlands Circle

Project Size: $18.6 million

Paya Lebar Methodist Girl School (Primary)

 

Proposed Upgrading Of Paya Lebar Methodist Girls’ School (Primary) At 298 Lorong Ah Soo

Project Size: $14.18 million

HDB

D&B of Upgrading Projects (G11E)

 

Design & Build Of Upgrading Projects For G11E

Project Size: $25.97 million

D&B of Upgrading Projects (G12E)

 

Design & Build Of Upgrading Projects For G12E (Stage 2)

Project Size: $26.3 million

LUP Bulk Contract 50

 

Building Works For Lift Upgrading Programme – Lup Bulk Contract 50

Project Size: $20.64 million

LUP Bulk Contract 60

 

Building Works For Lift Upgrading Programme – Lup Bulk Contract 60

Project Size: $19.12 million

Erection of Grid-tier Solar Photovoltaic system (CIGS – 1Mwp)

 

Solar Leasing Of Grid-tier Solar Photovoltaic System For Hdb Residential Blocks -cigs/Cis 1 Mwp

Project Size: $3.3 million

LUP at Tanjong Pagar Plaza Blocks 1 to 5

 

Building Works For The Lift Upgrading Programme At Tanjong Pagar Plaza Blocks 1 To 5

Project Size: $4.96 million

D&B of Upgrading Projects (G16C)

 

Design And Build Of Upgrading Projects For G16C

Project Size: $34.66 million

D&B of Upgrading Projects (G22D)

 

Design And Build Of Upgrading Projects For G22D

Project Size: $25.77 million

D&B of Upgrading Projects (G23C)

 

Design And Build Of Upgrading Projects For G23C

Project Size: $23.77 million

Multi-storey Carparks (Batch 12)

 

Addition And Alteration Works To Multi-storey Carparks (Batch 12)

Project Size: $8.2 million

NEA

Hawker Centres Upgrading Programme (Batch 4)

 

Proposed Additions & Alterations to Existing Single Storey Market (Block 92), Existing Single Storey Food Centre (Block 90 & 91) and Addition of 1 No. of ESS at Whampoa Drive (Hawker Centres Upgrading Programme – Batch 4)

Project Size: $6.86 million